Skip to main content

Oil and Gas

Oil and Gas

Proper oil well cementing with KURARAY POVAL™ as a fluid loss additive has been successfully performed for many years. This polyvinyl alcohol additive contributes to cost savings and has shown no retardation effect on the cement setting time. Therefore, it enables fast and cost-efficient oil well construction.

Image of oil and gas production platform, oil drilling
Chaeck mark

Benefits

  • Reduces fluid loss during cementing within API standards
  • Good compatibility with other cement additives
  • Lower cost than other fluid loss additives

Properties

Excellent binder

Reduces fluid loss

Reduces water production in cementing process

Compatible with other cement additives

Applications

Hydraulic fracturing

Soluble oil tools

Grades

Brochures

Brochures

Brochures

Contact or Request a Sample

Do you have any questions, need technical support or would like to request a sample?

Contact POVAL